AS/EN/SJAC Rev B First Article Inspection Form 1: Part Number Accountability. Sheet of. Form 1. A, B, C, D. 1, 1. Part Number: 2. Part Name: 3. AS/EN/SJAC Rev A First Article Inspection Sheet 1 of _. Form 1: Part Number Accountability Form 1, Rev A, Date: Oct 31, This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI).The purpose of the First Article Inspection is to.
Author: | Gagor Arashilrajas |
Country: | Cyprus |
Language: | English (Spanish) |
Genre: | Education |
Published (Last): | 11 November 2011 |
Pages: | 401 |
PDF File Size: | 11.89 Mb |
ePub File Size: | 1.32 Mb |
ISBN: | 177-5-68433-790-3 |
Downloads: | 12714 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Zolokree |
The three AS forms are: If something goes wrong in the process, the company can look back at the documentation to see exactly which part he needs to firms. This form helps an engineer validate the new process and demonstrates how this new process will be used along side existing methods.
Free AS9102 Forms
Filling out and tracking these forms help companies ensure validity and reliability when introducing new parts. With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it.
Some fields that might be considered conditionally required include drawing number, additional changes, and designing tool. These measures help guarantee repeatability of the production qs9102 these products.
What is AS? | Usable Forms 1, 2, 3 – Definitions and Requirements
This form lists all the characteristics of the part, including characteristic requirements and corresponding inspection results. Flrms for AS With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it.
Examples of optional information include the name of the person who prepared the FAI, the name of the person corms approved the FAI, the date FAI is reported, and the name of the customer who approved everything.
Importance of AS The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields. The part number accountability form designates specific names, serial numbers, and FAI report numbers for parts used in both the design and manufacturing process.
Finally, characteristic accountability evaluates verification and compatibility. Next, product accountability includes citation of raw material specifications, special processes, and functional testing.
This new revision was meant to consolidate multiple requirement forms as well as improve the process and organization of these forms. There are several advantages to companies adhering to this new standard. The AS az9102 consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.